Pen Making Supplies Logo
Have You Signed up for our Mailing List packed with free stuff, great offers and more???
Free Catalog
Penmaking Home Penmaking Index Page Penmaking Index Page Penmaking Index Page Pen Making Kits Pen Making Supplies Pen Making Supplies Penmaking Tools WoodWorkingCrafts.com Forums Steebar Home Page Pen Making Kits
Pen Making Supplies “Designer Elite” Screw on Cap Style Roller Ball / Fountain Pen Kits Assembly Instructions Pen Making Supplies
Looking for Penmaking Instruction Sheets? | Search for:
KIT FEATURES
• Heavy 24 kt. gold plating with epoxy coating
• Designed to match other Steebar Mont Blanc® style pens
• Elite designed center band
• Roller Ball refill with black ink
• Fountain Pen Iridium nib made in Germany
• Overall length: 5-3/4" (closed)
REQUIRED ACCESSORIES
• 7mm, long mandrel #PK-1001
• 3 pc bushing set #PK-1172
• Step drill bit set (2 bits) #PK-1176
• 2 part epoxy glue or SG-THICK Super Glue

Diagram A / Parts List & Layout

Preparing the Blanks

  • Cut 3/4" to 5/8" square blanks to the length of the
    brass tubes (add 1/16" for squaring off).
  • Drill center hole lengthwise through each blank. For
    the upper blank use the 2 step drill bit. For the lower
    blank use the 3 step drill bit.
  • Spread glue over tubes. Insert into proper blanks with
    a twisting motion to spread the glue evenly inside.
    Center each tube lengthwise in the blanks.
  • When the glue dries, square the ends of the blanks.
    You may use a belt/disc sander to take the wood
    down flush to the brass tube at each end making sure
    the ends are perpendicular to the tubes.

Diagram B / Turning The Blanks

Turning the Blanks

  • Place the stop bushing in the mandrel.
  • Place the upper cap bushing onto the mandrel, then
    slide on the upper blank. Next, insert center bushing
    with the larger diameter first, into upper blank. Slide the
    lower blank onto mandrel up over the center bushing.
    Insert the lower cap bushing and thread the lock nut
    hand tight. Bring up the tailstock snug with the live
    center (do not over tighten live center, it could damage
    the mandrel). Tighten both the stop bushing and the
    lock nut.
  • Turn wood down, flush with the bushings using a lathe chisel and sand paper. Taper the ends of the blanks (follow diagram 'B' for profile) to conform with upper and lower brass end cap bushings.

 


Note: The wood at the lower cap needs to fit inside the No Marr insert in the Barrel (cap). Be sure to turn the blank narrow
at the end section. Check the fit inside the insert before proceeding with sanding.

  • Removing wood for center band: Place a mark 1- 15/16" from the end of the upper blank. Use a parting tool to remove the excess wood down to the brass tube.
  • Continue until brass is completely shined. Be careful, you must retain a sharp 90° corner at the end of the upper blank when you remove the excess wood.
  • Sand both blanks then polish and/or wax the wood.

Diagram C - Assembly

Assembly

Notes: These instructions can be used for both the Roller Ball Pen and Fountain Pen. Follow assembly procedures below to properly handle either style.
• The insert is not the retainer used in #PK-1201. It is used to avoid marring the wood, not to to secure the pen closure.
• The cap should always be screwed on when the pen is not in use to avoid the ink drying up.

Assembly Tips

  • Line up the finished parts according to diagram C.
    • To press the parts together use a vice or a clamping instrument with wooden jaws. Press slowly with caution
    keeping all parts aligned to avoid cracking the wood or scratching the gold plated parts.

Upper Blank

  • Press the cap nut (screw end first) flush into the tapered end of the blank.
    • Place the threaded center band (square end first) over the exposed brass and press. (Band must be flush with the
    wood with no gaps).
    • Insert the upper cap thread into the clip – screw together into the cap nut.
    • Slide the no marr insert inside the upper blank (cap) narrow end first. Use a 1/4" Philips head or a sharp end
    screwdriver to drive the insert to the en

Lower Blank

  • Press the end cap into the tapered end of the lower blank.
  • Press the coupling into the opposite end of the lower blank.

    For Roller Ball:

    • Drop the spring into the blank and insert the refill into the blank up against the spring. Remove the refill tip
      protective cover.
    • Place the tip assembly over the point of the refill and screw it in snugly against the coupling.

      OR
      For Fountain Pen:

    • Place the Fountain Pen ink cartridge into the fountain pen tip with enough pressure to pierce the ink cartridge.
    • Screw the tip into the coupling with the cartridge attached.
    • Place upper barrel (cap) over the tip or nib. There are four starting thread positions. The thread will lock at each quarter of a turn.

Diagram D - Bushing Set (#PK-1172)

Search our site:
Search for:

Jump directly to a specific page

Want the inside scoop?

News and information, Steebar Exclusives,
Special Offers, Free Stuff and more!

Signup Here ..

On PenMakingSupplies.com you will find a complete line of Pen making kits, supplies and turning tools for the serious pencrafter. If there's something you can't find just send us an email and we'll be glad to point you in the right direction. Don't forget to stop by our wood working craft site WoodWorkingCrafts.com.

You may also be interested in our Clock Parts and Clock Making Supplies...



P.O. Box 607  Peapack, New Jersey 07977
Phone: (908) 204-0095 Fax: (908) 204-0099
Copyright © 2005, Steebar Corp.
Penmaking supply partner sites

 

 


pen making, pen supplies, pocket watch, pendant watch, pendant watch kits, liquid glass, epoxy resin, liquid glass epoxy